Asbestos Removal in Whittier

We arrange asbestos testing by a Cal/OSHA-certified consultant or technician and remove the material it finds in Whittier homes, from a single popcorn ceiling to a full teardown. South Coast AQMD’s Rule 1403 covers houses, and we work to it.

Ceilings, floors, walls and ducts are worth testing before a Whittier remodel, since nearly 9 in every 10 homes here were built before 1980.

Request a free quote
Empty living room with a textured popcorn ceiling, plain white walls, worn beige carpet, a sliding glass door and a window looking out to trees, and a doorway to a hall.

How we can help

Testing first

Samples and a lab report from asbestos testing come before any remodel work, so you know what the crew will meet.

Ceilings

Do your Whittier ceilings need popcorn ceiling removal? The lab report answers that, after samples are taken from the textured ceiling.

Ducts and pipes

A new furnace, duct run or air conditioner means renovation work under the rule. The sampling comes first, and HVAC duct and pipe insulation removal follows wherever asbestos is found.

Remodels and teardowns

Whittier teardowns and big remodels follow one sequence. The survey is first, the district notice second, and renovation and demolition abatement comes before any building crew starts.

Whittier housing

Half of Whittier’s homes were built in or before 1956, 29.5 percent were built before 1950, and 42.1 percent of Whittier households rent.

Houses and apartments

Apartment buildings, townhouses and condominiums are outside the district’s single-unit category, so the small-renovation survey exemption does not cover them. In Whittier that matters for the 21.2 percent of homes in buildings of five or more units, while 70.4 percent of homes are one-unit homes.

Owners and renters

Landlords in Whittier fall outside the owner-occupant provision. The district keeps it for an owner who lives in the house and carries out the renovation personally.

Asbestos rules for Whittier projects

The rules that apply are the district’s and the state’s, so confirm any permit steps for your address with Whittier’s building department.

The notice

The district notice is due no later than 10 working days before work begins, and a demolition always needs one. The district also says state law has anyone applying for a demolition permit hand the building and safety office a copy.

Waste

Whittier jobs follow California’s hazardous waste rules when the material is friable. That means a licensed hauler, a manifest to go with the load, and a record that the waste left the site as hazardous waste.

Attic with round silver-gray ducts running along the rafters, plank flooring, loose insulation along both sides and a small vent window at the far end.

Frequently asked questions

Do I need testing before a bathroom remodel?

Not in every case. The survey rule applies to renovation, and in a house with one unit the district skips it for a renovation removing less than 100 square feet. Testing is still how you learn the amount.

Is testing a separate step from removal?

Yes. Samples and the lab report come first, and the removal plan is built from them. A separate consultant handles clearance air testing when the work is done.

Does a condominium get the small-job survey exemption?

Not for the survey. The district’s single-unit definition leaves out condominiums, townhouses and apartment buildings, so the survey exemption stops there. The notice exemption for work under 100 square feet does not depend on housing type.

Do you handle a teardown?

Yes. We handle the abatement first, and the job needs the survey and a district notice on top of that.

The same district rules apply in La Mirada, and the home page lists all services.

Request a free asbestos removal quote

We recommend calling, but do feel free to contact us using this form. We'll get back to you with a free, personalized quote or additional questions as soon as possible. We're here to help.

Call (562) 521-8474

Call (562) 521-8474