Floor Tile and Mastic Removal in Norwalk

Typical cost in Norwalk

  • One bathroom or laundry floor, up to about 100 sq ft$1,200 – $3,000+
  • Kitchen floor, about 200–300 sq ft$2,000 – $5,000+
  • Several rooms of flooring, about 1,000 sq ft$5,000 – $12,000+

Floors in a Norwalk house can stack old tile, sheet vinyl and a layer of adhesive, and asbestos can sit in any of them. Each layer is sent to the lab, and nothing gets lifted before the results come back.

Look at how the district words it. Floor tile means asphalt and vinyl tile, and sheet vinyl counts when it contains more than one percent asbestos, all under the heading of resilient floor covering.

Request a free quote
Kitchen floor of square vinyl tiles in a faded, mottled rose-beige pattern, with wood cabinets, a white range at the back and sunlight through a window.

Flooring we remove

Vinyl floor tile

Square vinyl tiles in a kitchen, bathroom or garage get their own samples. Looking alike does not tell you what is in the tile, so each floor is tested.

The adhesive under the tile

Black mastic is the adhesive under the tile, and it is sampled together with the floor above it.

Sheet vinyl

Sheet vinyl is a layer, too, and the survey treats it like any other layer of the floor. It is sampled before a remodel takes it up.

A new floor over an old one

Carpet, laminate or newer tile can sit over the original floor. Sampling reaches the layers underneath, down to the joists.

Planning a floor job

A floor job is easier to plan once the lab results are in, because the results show which layers need removal.

Wet removal

Procedure 3, the district’s wet removal method, may be used only for nonfriable material, and we plan around that limit.

Where the waste goes

Waste that remains nonfriable falls outside California’s hazardous waste table, though other agencies can still place limits on where it is taken.

Registration for larger floors

Work that involves 100 square feet or more of asbestos-containing material needs the employer’s Cal/OSHA registration before it starts, so ask any floor crew whether it holds one.

Kitchen floor of cream and tan tiles lifted in places to show black adhesive and bare subfloor, with wood cabinets partly covered in plastic sheeting and a window at the left.

The floor survey is covered on the testing page, and every service is listed on our front page.

Request a free asbestos removal quote

We recommend calling, but do feel free to contact us using this form. We'll get back to you with a free, personalized quote or additional questions as soon as possible. We're here to help.

Call (562) 521-8474

Call (562) 521-8474